ABSTRACT Extraction and development sequences must be scheduled strategically in order to maximize the life of mine. The complexities and computational difficulties associated with underground mine planning makes it challenging and open to further research. This paper presents a mathematical programming framework based on mixed-integer linear programming (MILP) formulation for integrated open stope development and production scheduling. Additionally, the MILP model incorporates backfilling, operational levels control, and stope extraction duration control during production scheduling. The MILP model generated a net present value of $244.7 M and determined the capital, ventilation, operational, and ore pass development schedules as well as mining and processing schedules for a gold project with 25 years mine life. A total of 2.48 Mt of material was extracted and processed out of 2.88 Mt mineralized material.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.