Abstract

The University of Linkoping in Sweden was an example of phased construction. In this approach building work proceeds on the basis of the general requirements embodied in the first phase, while design work continues on the specific requirements of the second phase. A report from the National Swedish Institute for Building Research considers the implications.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.