Abstract

The leading phase operation of generator is an effective method to reduce voltage of the key point which is much high in valley load period. This paper reviews the history on leading phase of generator and introduces the current situation on stable monitoring of the generators leading phase capacity. Meanwhile, this paper proposes main restricted conditions of generator leading phase and analyzed in details. At last some experiments are performed for part generating sets with a capacity of 100MW above in one province and obtained the experiment results on voltage regulation through leading phase of synchronous generating sets.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call