Abstract
Due to introduction of new vehicle models, an automobile manufacturing enterprise usually needs to make corresponding adjustments of the facility layout of the door welding workshop. On the basis of analyzing the production process and logistics characteristics of the welding line, the facility layout of the workshop is improved and the production logistics cost is reduced by using the SLP (Systematic Layout Planning) and internal logistics analysis method. Finally, a real production example is given to illustrate the effectiveness of the proposed method.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have