Four major projects with large-scale rock underground caverns are discussed in this report; two hydropower stations, one underground oil storage facility and one underground museum in Japan. The technology applied to the construction of these caverns have some unique characteristics and can be applied to various other underground uses for different purposes and applied to larger-scale underground rock caverns with different geological and in situ stress conditions. Generally, construction of an underground cavern is comprised of five major activities: geological investigation; cavern stability analysis; initial rock support design; excavation works; and redesign of rock support according to the observational construction method. Weighted factors allocated among these factors should be established based on the rock properties and the purpose of the underground cavern use, which would define the major characteristics of the construction project. This report discusses some of major characteristics of these projects in Japan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.