Abstract
The Heze section of the Rizhao-Lankao High-Speed Railway (RLHR-HZ) officially began operations in June 2021. Previous studies have shown that the RLHR-HZ crosses two subsidence zones. In this study, we analysed ground displacement along the RLHR-HZ using Sentinel-1A SAR data collected from June 2021 to June 2023, employing both Permanent Scatterer and Distributed Scatterer techniques. The results indicate a reduction in the displacement rate; however, subsidence continues along the RLHR-HZ, with displacement rates ranging from −16 mm/yr to −5 mm/yr. This reduction is likely due to the cessation of mining activities and the replenishment of groundwater.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have