Abstract
This study is currently giving priority to developing the ship's ballast water treatment system using ozone (Ozone BWTS). The Ozone BWTS was tested in a full scale land?based mobile barge to evaluate performance according to the IMO G8 Guidelines. Test cycles using the mobile?barge were conducted in seawater and brackish water in the vicinity of the Port of Busan and Nakdong River, Republic of Korea. All tests were conducted according to the requirements of the G8 Guidelines. Test results show that the Ozone BWTS meets the Ballast Water Performance Standard contained in Regulation D-2 of the IMO Ballast Water Management Convention, as well as all of the operational, safety, and environmental testing requirements of the G8 Guidelines, as required for type approval of IMO. The study results show that the Ozone BWTS is capable of meeting the Ballast Water Performance Standard under Regulation D-2 of the International Convention for the Control and Management of Ships’ Ballast Water and Sediments, and also the more stringent standards being proposed under US legislation.
Paper version not known (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have