Abstract
Background: The development of Waste Power Plants (PLTSa) is an alternative waste management that can significantly reduce waste volume, especially in 12 areas with large amounts of waste. However, to this date, the development of PLTSa has faced obstacle, despite numerous regulations issued to accelerate its implementation in these areas. The issue of waste accumulation is urgent as it can have adverse effects on the environment and community’s well-being. Because it is regarded as a form of environmental pollution, the accumulation of waste become an environmental crime. Method: From a criminological perspective. Findings: Actions that are causing delays in PLTSA development can be categorized as environmental crimes due to subjective deviations and actions that objectively violate existing regulations. Conclusion: With the urgency of rising waste volumes, there is a need for reinforcement of regulations regarding of the implementation of PLTSa development, including the Presidential Regulation No. 35 of 2018, which pertains to accelerating the construction of PLTSa developments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.