Abstract

The causeway for project workers uses a scaffolding device for road safety for project workers which is focused on holding the load according to the dimensions of the tool. In the Pilot Scale Product Development Facility Building Project (Building No.34) PT. Biofarma used the Ringlock scaffolding System type of scaffolding. Ringlock Scaffolding System. Direct observation in the field. The maximum load that can be supported by the Vertical Standard is 2,000 kg, the reduction value is 0.5 due to unpredictable field conditions. 1,000 kg is the most weight for a scaffolding pole. In the ringlock scaffolding scaffolding for the construction of building No. 34 PT. Biofarma 1,000 kg > 984.7746 kg which means sturdy and strong.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.