Abstract

PT Allied Inco Coal Jaya (PT. AICJ) is a company that work in coal mining industry. This research is done at underground mining located at main shaft tunnel at +347 metres above mean sea level (MASL) with 334,04 m in length with room and pillar method as its mining method. This research is using quantitative method. From the calculation obtained, the total of incoming water into the mining production area is 6.13 m3/hour. For the actual incoming from well is as much as 13.32 m3/hour with the total head is as big as 29.56 m, as the time needed to discharge is 6.45 hour. Making the dewatering layout design for the incoming water at elevation of +347.32 MASL to main sump at +318 MASL with total length of 201.6 m, while the water discharged at continuous pumping at elevation +306 MASL moving toward +347.43 MASL with total distance 341.32 m. with the addition to incoming water there is an increase in the pumping working hours so it is concluded that there is difference between the planned cost and actual cost of Rp. 832,269.96.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.