Abstract

Abstract Multiple-layered coal seams widely exist in main coal mining areas of China. When these coal seams are exploited, the pillar mining method is always employed. This leads to many coal pillars left in the upper coal seams as a protective barrier. As a result, these residual pillars will not only cause the loss of coal resources but also could trigger environmental issues and a serious of mine disasters. A theoretical model was built to analyse the effect of the residual pillars. From the theoretical model, it was found that four stress concentration areas were formed by the upper residual coal pillars. To address the issues of the residual coal pillars, Datong Coal Mine Group has developed an innovative technology of the roof cutting with a chainsaw. A new protective coal seam mining method using chainsaw roof-cutting technology is introduced. A numerical model is constructed to analyse the mining pressure distribution law in working face within the lower layer coal seam. From the numerical simulation, the new protective layer mining method could reduce about 15.2% of the advancing stress, which contributes a lot to controlling the mining pressure within the lower layer. The field measurement showed that the hydraulic support utilised at the site was at lower pressure levels, which proves the new protective seam mining method can significantly reduce the working face pressure.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.