Abstract

The Government of Cameroon's lack of priority for rural water supply has motivated rural communities to harness their internal capacity and networks for self-help community water supply projects. The emerging paradigm of joint water supply projects between communities in rural Cameroon and large corporations, with both parties as principal beneficiaries (unlike self-help projects where the principal beneficiary is the community), is examined. Our findings, based on the Mautu community and the Cameroon Development Corporation (CDC) joint project, suggest that this paradigm can be an attractive alternative for rural communities to gain access to piped water systems. However, to ensure long term performance of the rural community's distribution network, the more experienced corporate partner should negotiate a fair agreement, integrate capacity building for operation and maintenance, and include future growth and increased demand in the design of the community's network. Significant inequity during design of the supply to the two partners can lead to the dysfunction of the community system and trigger the perception of profiteering by the corporate partner resulting in subsequent vandalism. It is recommended that such joint partnerships be regulated and that local institutions working with rural communities should educate them on available support services.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.