Abstract

In this study, system maintenance and production scheduling are jointly decided to solve the problems of resource idleness and time cost increase due to system maintenance in the processing of production scheduling. Based on the previous research on the integration of scheduling and maintenance of single machine and multi machine, considering the deterioration and economic dependence of each component in the system, a joint strategy of multi component condition-based maintenance combined with production scheduling is formulated. All the maintenance combinations and probability calculation formulas in the production scheduling process are developed using the deterioration state space partition method, and the probability density function and its numerical solution method are derived. A joint decision model is established to minimize the total weighted expected completion time. Finally, taking the KS5 adjustable multi axis tapping machine as an example, numerical experiments were conducted to verify the correctness of the proposed strategy and the established model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.