Abstract

This paper develops a joint decision-making model approach to preventive maintenance and SPC (statistical process control) with delayed monitoring considered. The proposal of delayed monitoring policy postpones the sampling process till a scheduled time and contributes to six renewal scenarios of the production process, where maintenance actions are triggered by scheduled duration of preventive maintenance or the alert of X ¯ chart for monitoring the shift of process mean resulted by deterioration of equipment. By analyzing the evolution of the system in different scenarios, a mathematical model is given to minimize the expected cost per unit time by optimizing values of five variables (scheduled duration without monitoring, scheduled duration of preventive maintenance, sample size, sampling interval and control limit). The results of a numerical example indicate that the hourly cost of the proposed model is lower than the model that delayed monitoring is not considered when the system has a low hazard rate during the early period. Finally, a sensitivity analysis is performed to demonstrate the effect of model parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.