Abstract

PurposeThe purpose of this study is to develop a joint production, maintenance and quality control strategy involving a periodic preventive maintenance policy.Design/methodology/approachThe proposed integrated policy is defined and modeled mathematically.FindingsThe paper focuses on finding simultaneously the optimal values of the preventive maintenance period, the buffer stock size, the sample size, the sampling interval and the control chart limits, such that the expected total cost per time unit is minimized.Practical implicationsThe paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance and quality. The considered system consists of one machine subject to a degradation process that directly affects the quality of products. The process and product quality control is carried out using an “x-bar” control chart. In the proposed model, a preventive maintenance action is performed every inspections of product quality in order to reduce the shift rate to the “out-of-control” state. A corrective maintenance action is undertaken once the control limits are exceeded. In order to palliate perturbations caused by the stopping of the machine to undergo maintenance actions, a buffer stock is built up to ensure the continuous supply of the subsequent machine. The main goal of this work is to develop a model that captures the underlying link between the preventive maintenance policy, the buffer stock size and the parameters of an “x-bar” control chart used to control the quality of the product. Numerical experiments and a study of the effects of the input parameters variation on the obtained results are performed.Originality/valueThe existing models that simultaneously consider maintenance, inventory and control charts consist of a condition-based maintenance (CBM) policy. Periodic preventive maintenance (PM) has not been considered in such models. The proposed integrated model is original, in that it links production through buffer stocks, quality through a control chart and maintenance through periodic preventive maintenance (different practical settings and modeling approach than when CBM is used). Hence, this paper addresses practical situations where, for economic or technical reasons, only systematic periodic preventive maintenance is possible.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.