Abstract

This paper presents a Heuristic solution procedure to achieve an integrated consideration of production scheduling on the assembly line and the efficiency in the finished-goods delivery. For production scheduling, production smoothing in models and product attributes is considered; for finished-goods delivery, it considers effective grouping of finished goods and even distribution in delivery dates for a destination, in order to ship products as they are produced. The Heuristic procedure first forms packages of units and then assigns packages to various days. The computational results based on randomly-generated problems showed the advantage in cost savings by an integrated consideration. A simulated annealing procedure is developed for package assignment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.