Abstract

This paper focuses on the formulation and solution of the problem of planning vehicle routes for material delivery within the premises of a plant working under a just-in-time production system. The unique characteristic of this problem is that the quantity to be delivered at each of the demand nodes is a function of the route taken by the vehicle assigned to serve that node. The problem is modeled by adding a non-linear capacity constraint to the standard vehicle routing model, such that vehicle idle times and inventories at the customer locations are minimized. A heuristic solution procedure is outlined, and the formulation of a lower-bound relaxation is suggested. The performance of the heuristic solution procedure is evaluated in comparison to the lower-bound relaxation, and the heuristic procedure is shown to provide generally good results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.