Abstract

In practice, processing times can be more accurately represented as intervals with the most probable completion time somewhere near the middle of the interval. A fuzzy number which is essentially a generalized interval can represent this processing time interval exactly and naturally. In this work, triangular and trapezoidal fuzzy numbers are used to represent those vague job processing times in job shop production systems. The job sequencing algorithms of Johnson and Ignall and Schrage are modified to accept fuzzy job processing times. Fuzzy makespans and fuzzy mean flow times are then calculated for greater decision-making information. Numerous examples are used to illustrate the approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.