Abstract

Maximum operator distorts the shape(s) of Triangular Fuzzy Numbers (TFNs) and Trapezoidal Fuzzy Numbers (TrFNs) in many problems such as Flow shop scheduling, job-shop scheduling and project scheduling. In this paper, we introduce an appropriate approximation for the maximum operator, in which the weak-dominance fuzzy numbers are ranked based on the concept of preference ratio. Since in most practical cases the due dates and the processing time of scheduling are not deterministic, we consider the scheduling problems with fuzzy processing time. Finally we develop a novel fuzzy CDS algorithm in fuzzy flow shop scheduling by applying the preference ratio concept through an example.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.