Abstract

Consideration of alternatives for a development project, with the prime objective of selecting the most appropriate alternative that supports sustainability of the environmental resources, should be the heart of an EIA study. This study was undertaken to examine how alternatives were addressed in 46 EIA reports for infrastructural projects accorded environmental clearance in India, adopting the yardsticks used by Sadler for evaluating effectiveness and criteria-based evaluation. The EIA process considers alternatives superficially and the terms of reference lack emphasis on a wide range of reasonable alternatives, even for potentially controversial and large projects. Radical improvements are needed in the EIA process through a core legislated scoping, and transparent and rigorous appraisal of proposals right from “upstream” through “downstream” of project life-cycle. The capacity building of professionals associated with the EIA process on the structured methodologies for identification, development, and analysis of reasonable alternatives should help meet the EIA objectives.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.