Abstract

ABSTRACTThe degree of robustness of environmental management program in the EIA reports of 56 green-field and 28 brown-field environmentally approved projects was found to be low, revealing that it is not considered seriously by the EIA consultants and the decision-makers. EMPg, akin to EIA follow-up, specific to a project at a given location, is the most important output of the EIA process especially for the developing countries where priority is on the economic development by way of development projects and the EIA process has inherent weaknesses. A meticulously prepared, implemented, operationalized, monitored, periodically audited and continually improved EMPg in different life-cycle phases of a project could possibly offset limitations of the EIA process. Considering lack of guidelines available on the development of EMPg, elaborate guidelines are proposed. EMPg could be prepared as a separate document to facilitate development of project manual. TOR for brown-field projects need a totally different approach. Amending the currently followed EIA process and introducing an additional stage of mandatory approval of EMPg, and third party audit would improve its robustness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.