Abstract

In close cooperation, GEC Alsthom, Alcatel Alsthom Recherche and Electricite De France are investigating the technical feasibility and the economical impact of low T/sub c/ superconducting fault current limiters, intended for the French HV and EHV electrical grids. The program includes the complete design of a 63 kV/1.25 kA/5 kA/spl circ/ version, experienced on current and voltage models. Extensions to the HV prototype demonstration, and to the EHV fault current limiters, are also discussed in this paper. >

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.