Abstract

This study reports the results of the analysis of probe data, collected in the periods immediately before and after the foreshock in Kumamoto on April 14, 2016. Data were gathered under actual urban traffic conditions, and the traffic activity evaluated. The study also identifies any issues to be addressed in future, based on this analysis. The analytical results quantitatively show that movement from Fukuoka to central Kumamoto was impacted by closure of the Kyushu Expressway; it also shows that travel times during the day along alternative paths significantly increased, whilst congestion on highways decreased. The results show that locations such as shelters, supermarkets, and public baths were the beginning and end points of travel, thereby causing deviations from normal congestion patterns.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.