Abstract

Fast Decoupled Load Flow (FDLF) is a very popular and widely used power flow analysis method because of its simplicity and efficiency. Even though the basic FDLF algorithm is well investigated, the same is not true in the case of additional schemes/modifications required to obtain adjusted load flow solutions using the FDLF method. Handling generator Q limits is one such important feature needed in any practical load flow method. This paper presents a comprehensive investigation of two classes of schemes intended to handle this aspect i.e. the bus type switching scheme and the sensitivity scheme. We propose two new sensitivity based schemes and assess their performance in comparison with the existing schemes. In addition, a new scheme to avoid the possibility of anomalous solutions encountered while using the conventional schemes is also proposed and evaluated. Results from extensive simulation studies are provided to highlight the strengths and weaknesses of these existing and proposed schemes, especially from the point of view of reliability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.