Abstract

Wellbore instabilities due to mud related issues during well construction in the wetland Niger Delta region were analyzed, reviewing well A as a case study. Time distribution plots and activity break down summary were evaluated for the candidate well. From the analyses, drill bit and bottom hole assembly balling, largely due to soft sticky and reactive gumbo shale with high swelling and dispersive tendencies in the mud system, severe down hole losses, hole pack off, pipe stuck potentials and kicks are some likely mud related challenges often encountered drilling in the Niger Delta region. Consequent upon which there would be reduced rate of penetration, tight spot, increased torque and drag, as seen in well-A. The drilling fluids play pivotal roles in oil extraction processes as their type; design and formulation determine the ultimate success of the entire drilling operation and overall production performance of the well. A poorly designed mud system may trigger wellbore instability that could lead to non-productive time, loss of drilling equipment, even loss of the entire well, kick and blowout scenarios due to loss of primary and secondary barriers. Formation damage may occur, which ultimately leads to reduction in permeability and poor well performance,

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.