Abstract

This paper introduces the basic situation of the 35-kV domestic high temperature superconducting (HTS) power cable project in Shanghai. The target of this project is to construct and put into operation the first 35-kV km level three-phase turn-key HTS power cable project in the world. The cable transmission capacity, cable routing selection, cable structure design, cooling system configuration, etc. of the project are introduced. The project is implemented by the State Grid Corporation Shanghai Electric Power Company. A 35-kV, 1.2-km-long 220-kV inter-substation connecting HTS cable line will be constructed in the core urban area of Shanghai. So far, the type test of the HTS power cable system has been completed, and the construction of the project has begun. The project is expected to be completed and put into operation in the second half of 2020.