Abstract

To make full use of the flexible adjustment capability of DC tie-lines in multiarea AC/DC systems and to coordinate the generation resources and load demand of multiarea AC/DC systems, this paper presents an intraday two-stage hierarchical optimal scheduling model for multiarea AC/DC systems based on analytical target cascading (ATC). To avoid repeated adjustment and overadjustment of DC tie-lines after wind power integration, a two-stage rolling coordinated scheduling model for the area subsystem based on model predictive control (MPC) is proposed. The two-stage rolling coordinated scheduling method takes into consideration the influence of the predicted value in the future finite time domain and the latest measured DC tie-line power on the current scheduling state. Based on the ATC and the area decomposition criterion of the AC/DC grid, an optimal scheduling model for the upper-level system is proposed that takes into consideration the DC tie-line adjustment constraints and the area coupling constraints. The optimal scheduling model for the upper-level system formulates the two-stage DC tie-line plan for the multiarea AC/DC system, and the two-stage rolling coordinated scheduling model of the area subsystem solves the subproblems of the generation plan for each area subsystem in a parallel manner considering the area coupling constraints. The proposed method can achieve intraday two-stage decoupling scheduling of multiarea AC/DC systems and promote the cross-area consumption of large-scale wind power through flexible adjustment of the DC tie line. This approach also reduces the communication burden between the area subsystems and ensures the efficiency of the solution algorithm.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call