Abstract
In the era of knowledge-based economy, innovation is ubiquitous and new technologies emerge in an endless stream. Many traditional construction techniques with inherent deficiency has been gradually replaced by new ones. On account of current construction of pile foundation engineering with slurry wall protection, slurry is manually replenished and slurry indexes are repeatedly measured by manual work, which affects the construction schedule and keeps security risks. This thesis proposes a new technique, in which slurry pressure variation values replace the specific gravity changes and linkage with slurry pump is utilized, which achieves automatic replenishing of slurry in pile foundation construction and realizes intelligent construction of pipe foundation engineering with slurry wall protection.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Engineering and Technology Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.