Abstract

Summary In this paper, a two-part (i.e., normal part and reserve part) control scheme is presented for a single wind turbine generator and then extended to a set of them called wind power plant. The proposed method can be applied under the normal operation of the system or emergency condition in which the generating power drops, suddenly. In this work, initially, a novel control scheme is proposed for both single wind turbine generator and wind power plant under the normal condition. Then, the reserve part of the scheme is presented with the aim of injecting huge amount of energy to the network, and therefore improving the frequency, after an outage of a generating unit. The proposed scheme is applied to two case studies to validate the performance. Finally, a comprehensive analysis is performed, and the effects of different parameters on the system's frequency behavior are evaluated for different wind speed profiles. Copyright © 2016 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.