Abstract

The need for residential houses is still high for property and construction commodities. The availability of land and market prices for residential houses continue to increase yearly. Only 45.04% of Jakarta residents had a home ownership status in 2020. 2021 is the precast building mode. It is justified that precast construction structures can save 35% on construction costs and are 27.33% more reliable than ordinary concrete structures. The research examines the integration of the PERT method and earned value management (EVM) based on Java programming in residential precast case studies. The results of this study are that the implementation of the PERT method can increase the efficiency of project duration by 6%, and the implementation of the EVM method can increase project cost efficiency by 7% with the indicators Schedule Performance Index (SPI) = 1.01 (under schedule) and Cost Performance Index = 1, 07 (Under Budget)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.