Abstract
Validating assembly precedence and generating shop floor work instructions for highly configured assemblies involving over 1000 components can be very time consuming and inaccurate. This paper will define and demonstrate a process for mapping the 3D product assembly model to the Process Routing which is linked to the assembly line. A key enabler of this technique is a method to map the consumption of 3D model components in the process plan via a configured BOM and Routing using Model and Option rules. This method will be shown.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have