Abstract

In this study, a continuous-time hybrid stochastic/robust optimisation is proposed for the integrated investment in transmission lines (TLs) and energy storage systems (ESSs) with high penetration of uncertain wind power generation (WPG) sources from a central planner viewpoint. The main objective of the problem is to achieve a simultaneous expansion of transmission assets, TLs and ESSs, whereas minimising the investment cost while taking the operational aspects of a power system into account to accommodate higher shares of uncertain and intermittent WPGs. However, the integrated expansion planning of joint TL and ESS to integrate WPGs via conventional hourly discrete time model can increase the operation cost and result in a non-optimal sizing and siting of TLs and ESSs, hence, can impose an opposite effect on the favourite. Accordingly, a continuous-time model is proposed to coordinate the expansion planning of both TL and ESS to deal with sub-hourly uncertainty of WPGs. Also, the WPG uncertainty in expansion planning problem is characterised using a hybrid stochastic/robust optimisation framework. Numerical tests are implemented on a modified IEEE RTS 24-bus system and the achieved results confirm the efficiency of the proposed model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.