Abstract

In order to solve the problem of water injection string failure caused by pipe creep and sand production in layered water injection wells, an integrated technology of layered sand control and layered water injection has been developed. A suspended large-radiuslayered mechanical sand control pipe column has been designed, providing sufficient design and usage space for the layered water injection pipe column. Developing a new type of anti-creep sealed packer can effectively improve the anti-creep performance of the water injection string and extend the validity period of the string. This technology integrates and optimizes layered water injection and sand control technology, large channel backwashing technology, integrated testing and allocation technology, and anti-creep technology of the pipe string. While effectively solving sand production in offshore water injection wells, it extends the service life of the water injection pipe string and reduces operating costs. Since 2018, this technology has been implemented in over 200 wells in Chengdao Oilfield, with a maximum of 6 layers for prevention and injection, a maximum well inclination of 48.8°, and a construction success rate of over 90%. It has achieved very good development results and economic benefits.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.