Abstract
In this paper, the integrated scheduling of handling equipment at the railway handling area in container terminals is studied, where rail-mounted gantry cranes, internal trucks, and reach stackers are deployed. In the course of the handling operation, loading and unloading containers are handled simultaneously. The handling process is first studied and some scheduling schemes are put forward. Based on the analysis, the problem is formulated as a mixed-integer programming model, with the objectives of minimizing the makespan and the total waiting time of all equipment. Then, to solve the problem, a genetic algorithm is employed, where the first available machine rule is applied in the selection of trucks and reach stackers. Sets of numerical experiments are conducted to verify the effect of the proposed algorithm. Based on the results of experiments, some key indicators are calculated and the effects of different equipment configuration schemes are studied.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.