Abstract
This paper studies the production and distribution planning problem faced by the iron ore mining companies, which aims to minimize the total costs for the whole production and distribution system of the iron ore concentrate. The ores are first mined from multiple ore locations, and then sent to the corresponding dressing plant to produce ore concentrate, which will be sent to distribution centers and finally fulfill the customers' demands. This paper also tackles the difficulty of variable cut-off grade when making mining production planning decisions. A mixed-integer programming model is developed and then solved by a Lagrange relaxation (LR) procedure. Computational results indicate that the proposed solution method is more efficient than the standard solution software CPLEX.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.