Abstract

ABSTRACTThis study is motivated by the practices of large iron and steel companies that have steady and heavy demands for bulk raw materials, such as iron ore, coal, limestone, etc. These materials are usually transported to a bulk cargo terminal by ships (or to a station by trains). Once unloaded, they are moved to and stored in a bulk material stockyard, waiting for retrieval for use in production. Efficient storage space allocation and ship scheduling are critical to achieving high space utilization, low material loss, and low transportation costs. In this article, we study the integrated storage space allocation and ship scheduling problem in the bulk cargo terminal. Our problem is different from other associated problems due to the special way that the materials are transported and stored. A novel mixed-integer programming model is developed and then solved using a Benders decomposition algorithm, which is enhanced by the use of various valid inequalities, combinatorial Benders cuts, variable reduction tests, and an iterative heuristic procedure. Computational results indicate that the proposed solution method is much more efficient than the standard solution software CPLEX.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.