Abstract

ABSTRACT Contamination of ground water as a consequence of soil leaching processes is an issue of major concern. In this context, a simulation of the soil leaching process was designed. A sequential injection (SI) method to monitor the soil leaching of iron complexes with in-line rain simulation for leachate production is described. The developed methodology comprises the SI determination of both iron(III) and 3-hydroxy-4-pyridinones iron(III) complexes, coupled to a mini soil column (mSC) for displaying in-line rain simulations. The described SI method enabled iron(III) determination within the range 2.0–35 µmol L−1, with a detection limit of 0.42 µmol L−1, and determination of iron(III) complexes in the range 1.0–45 µmol L−1. It was successfully applied to leachates from laboratory scale soil columns (LSSC), with good precision for both iron(III) and iron complexes determinations: calculated relative standard deviation (RSD) of 5% and 6%, respectively. A step further in automation and miniaturization was attained with the incorporation of a mini soil column for the in-line leachate production. The system enabled the soil leachate production and assessment in less than 5 min, including determinations in triplicate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call