Abstract
Construction crew productivity is affected by the motivation of the crew performing given activities and by situational/contextual factors forming the dynamic construction environment. The literature lacks a comprehensive analysis of causal relationships between crew motivation and situational/contextual factors for dynamic modelling of crew productivity. The contributions of this paper are (1) identifying a set of criteria for performing expert weight assignment for heterogenous group experts in productivity research, (2) proposing an integrated fuzzy analytic hierarchy process–fuzzy decision-making trial and evaluation laboratory approach that provides a systematic, structured method for determining causal relationship mapping between factors affecting crew productivity, and (3) proposing an approach for identifying cause-and-effect groups among the situational/contextual factors and crew motivation, which can further be used to formulate strategic productivity improvement solutions. The proposed methodology is demonstrated using a case study on an actual industrial construction project in Alberta, Canada.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have