Abstract

<p>With a main span of 1018m Stonecutters Bridge is the second longest cable-stayed bridge in the world. The construction of the bridge has been an unusual challenge and required innovative solutions to enable an efficient and safe erection. This paper outlines major construction engineering schemes and the solutions developed to harness the challenges of construction.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.