Abstract

<p>Stonecutters Bridge will be the second longest cable-stayed bridge in the world with a main span of 1018m. This paper describes the construction of the concrete backspans and the steel deck around the bridge towers. The construction of the concrete backspans was one of the most difficult aspects in the erection of the bridge. At a height of about 70m a geometrically complex grillage deck, monolithically connected to the piers was to be constructed. The concrete girders are constructed on a unique and purpose-designed falsework system, suited to the contractor’s needs. An 88m long portion of the steel deck to either side of the tower was to be erected on falsework but an alternative Heavy Lift scheme was developed, yielding economical, programme and quality advantages. This paper describes the development of the construction procedures, the design of the temporary works, the construction engineering aspects of adequacy checks and geometry control, and how the challenges of construction were harnessed.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.