Abstract
On February 1, 2004, a 12.9-km (8-mi) bus rapid transit (BRT) line began revenue operation in Jakarta, Indonesia. The BRT line has incorporated most of the characteristics of BRT systems. The line was implemented in only 9 months at a cost of less than US$1 million/km ($1.6 million/mi). Two additional lines are scheduled to begin operation in 2005 and triple the size of the BRT. While design shortcomings for the road surface and terminals have impaired performance of the system, public reaction has been positive. Travel time over the whole corridor has been reduced by 59 min at peak hour. Average ridership is about 49,000/day at a flat fare of 30 cents. Furthermore, 20% of BRT riders have switched from private motorized modes, and private bus operators have been supportive of expanding Jakarta's BRT. Immediate improvements are needed in the areas of fiscal handling of revenues and reconfiguring of other bus routes. The TransJakarta BRT is reducing transport emissions for Jakarta and providing an alternati...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.