Abstract

AbstractBecause of the complexity of construction projects and the frequency of project transactions, smart project management has a huge amount of transaction and operation data. Massive transaction and operation data urgently need a safe, efficient and low–cost storage and data analysis to realize fine management of buildings, low–cost transaction and interconnection of project information. Therefore, the construction project management system based on internet of things blockchain has been gradually improved, and more and more researches have been made on it. This article proposes a parallel design scheme. Parallel algorithms disperse the repeated calculation work on each node, reduce the calculation load and calculation time of a single node, effectively improve the efficiency of the algorithm, and enable it to process large–scale data of different sizes in parallel. Improve the algorithm according to the experiment, and analyze the performance of the parallel algorithm according to the experimental results. Experiments show that Apriori algorithm and K‐means algorithm based on MapReduce are more than 85° optimized than traditional data mining.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.