Abstract

The present investigation observed the effect of current density (CD), operating time (OT), inter electrode distance (IED), electrode area (EA), initial pH and settling time (ST) using Al-Al electrode combination on the removal of color, total suspended solids (TSS), hardness (HR) and alkalinity (ALK) from biologically treated municipal wastewater (BTMW) of Sewage Treatment Plant (STP), Jagjeetpur, Haridwar, India. The maximum removal of color (99.86%), TSS (98.7%), HR (78.9%) and ALK (43.69 %) from BTMW was found with the optimum operating conditions of CD (2.65 A/m2), OT (40 mins.), IED (0.5 cm), EA (160 cm2), initial pH (7.5) and ST (60 min.). However, the maximum removal of ALK was found with the optimum operating conditions of CD (1.68 A/m2), OT (40 mins.), IED (1.0 cm), EA (80 cm2), initial pH (7.5) and ST (90 min.) The electrolytic treatment ( ET) brought down the concentration of HR and ALK to the desirable limit of the BIS standards of drinking water. There was no need of pH adjustment of the BTMW during ET as the optimal removal efficiency was close to the pH of 7.5. Under optimal operating conditions, the operating cost was found to be 1.01 $/m3 in terms of the electrode consumption (23.71x 10-5 kg Al/m3) and energy consumption (101.76 Kwh/m3). The study revealed that BTMW can be effectively treated with the Al-Al electrode combination for color, TSS, HR and ALK removal.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.