Abstract

The present investigation observed the effect of current density (CD), operating time (OT), inter electrode distance (IED), electrode area (EA), initial pH and settling time (ST) using Fe-Fe electrode combination on the removal of chemical oxygen demand (COD) and biochemical oxygen demand (BOD) from biologically treated municipal wastewater (BTMW) of Sewage Treatment Plant (STP). The maximum removal of COD (92.35%) from BTMW was found with the optimum operating conditions of CD (2.82 A/m2), OT (40 mins.), IED (0.5 cm), EA (160 cm2), initial pH (7.5) and ST (60 min.), while the maximum removal of BOD (84.88%) was found with the ST (30 min.) at the same operating conditions. There was no need of pH adjustment of the BTMW during ET as the optimal removal efficiency was close to the pH of 7.5. Under optimal operating conditions, the operating cost was found to be 54.29 Rs./m3 / 1.08 US$/m3 in terms of the electrode consumption (78.48 x 10-5 kg Al/m3 ) and energy consumption (108.48 Kwh/m3).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call