Abstract

Performances of a braced cut-and-cover excavation system for mass rapid transit (MRT) stations of the Downtown Line Stage 2 in Singapore are presented. The excavation was carried out in the Bukit Timah granitic (BTG) residual soils and characterized by significant groundwater drawdown, due to dewatering work in complex site conditions, insufficient effective waterproof measures and more permeable soils. A two-dimensional numerical model was developed for back analysis of retaining wall movement and ground surface settlement. Comparisons of these measured excavation responses with the calculated performances were carried out, upon which the numerical simulation procedures were calibrated. In addition, the influences of groundwater drawdown on the wall deflection and ground surface settlement were numerically investigated and summarized. The performances were also compared with some commonly used empirical charts, and the results indicated that these charts are less applicable for cases with significant groundwater drawdowns. It is expected that these general behaviors will provide useful references and insights for future projects involving excavation in BTG residual soils under significant groundwater drawdowns.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.