Abstract

The double‐side heading method is often used in the construction of large‐span and large‐section tunnels. The excavation of the pilot tunnel is complex, so the construction efficiency is low. Based on the underground excavation tunnel project of a subway in Guangzhou, the section excavation sequence of the traditional double‐side heading method is optimized according to the actual situation. Midas/GTS software is used for finite element analysis, the displacement and internal force of ground settlement and support structure under two different section excavation sequences are calculated, and the calculation results are compared with the field monitoring data. The calculation results show that the influence of the two excavation sequences on the displacement of the supporting structure is not much different, but the influence on the internal force of the supporting structure is obviously different. The stress value of the supporting structure caused by the optimized excavation sequence is larger, especially the temporary inverted arch, but it is within the controllable range. The optimized excavation sequence increases the construction work surface, greatly improves the construction efficiency, and reduces the project cost, which can provide a reference for the construction of urban subway tunnels under similar engineering conditions in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.