Abstract

Changes in functional properties of biological denitrification in the long-term use of methanol were explored in both pre- and post-denitrification processes. The two systems employed were sequencing batch reactor (SBR) using post-denitrification in temporal sequence, and Carrousel oxidation ditch, which was equipped with a separate pre-denitrification zone. In the SBR, stable nitrate reduction rates reached after 37 days elapsed with addition of methanol (TOC/N = 1.4-1.8) at the start of anoxic phase, and specific denitrification rate increased from 0.378 mgNOx-N·(gVSS·h)-1 to 2.406 mgNOx-N·(gVSS·h)-1. Besides, by means of nitrogen uptake rate (NUR) batch tests based on methanol-adapted sludge, the appropriate range of TOC/N ratios for complete denitrification was estimated to be 1.10-2.68. By comparison, the Carrousel oxidation ditch that was fed with methanol in the anaerobic zone took fewer days (29 days) to obtain a constant effluent nitrate. Moreover, the denitrification yield in ditch was elevated from an initial value of 0.082 mgTN/mgCOD to 0.123 mgTN/mgCOD, and the nitrogen removal efficiency reached up to a level of 68%. The focus on denitrification potential with external methanol is valuable to provide information for developing carbon dosage control, as well as predict the nitrate effluent quality of the plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.