Abstract

Objectives. Improve the working conditions and productivity index through the implementation of Industrial Safety and Hygiene and Plant Distribution actions in a pressure foundry company. Methodology. 1. Analysis of the manufacturing process of aluminum and zamak parts. 2. To identify the risk elements those do not allow to work in a safe and a right way. 3. To assign safety equipment according to the risks of the area and the integration of a Joint Commission on Safety and Industrial Hygiene. 4. To identify the containers for waste management in the different phases of the process. 5. To re-distribute the lay out to improve ventilation and lighting of the areas. 6. To analyze the results, considering the impact on the improvement of the company's productivity. Contribution. Ensure the safety of its employees, achieve a better work environment, comply with established regulations and improve productivity in the company.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.