Abstract

Presently accelerator facilities emphasizes on generating charged particles with enhanced energy and flux. The radiation protection practices at these facilities are considered in civil engineering designs and strictly implemented through different administrative, access control measures (Sarkar in Radiat Meas 45:1476–1483, 2010). However, concern arises from induced activities, during maintenance and decommissioning stages, when sections of accelerator and shielding materials become highly radioactive. Major contribution of induced activity arises from stainless steel (SS-304) beam enclosures and Cu-dumps. Present work focuses on the generation of induced radioactivity profiles with delay counting of SS-304 and Cu along with instantaneous gamma and neutron dose rate measurements at various proton energies for source term estimation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.