Abstract

After the radioactive material leak accident at the J-PARC hadron experimental facility on May 23, 2013, we designed a new production target, which is capable of a primary proton beam with the energy of 30 GeV and power of 50 kW. It is made of gold and cooled by water through a copper block. For the countermeasures of the recurrence of the accident, the target is enclosed by an airtight chamber and helium gas is circulated to monitor the target soundness. In this paper, technical details of the new target design are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.